The Sault Area High School in Sault Ste. Marie, Michigan was refinishing their gymnasium floor and installing new bleachers. Upon removal of the old bleachers it was discovered that the gymnasium floor had settled along the west wall. A Concrete Lifting contractor was referred to by an outside engineering firm to repair the sunken floor. An appointment for inspection of the area was made and it was determined that ninety feet of the floor had settled one and a half inches. Because the wood floor could not be removed it was decided that HMI 401 high density polyurethane foam would be used to lift the concrete. An estimate for the repair was written the next day and later approved by the high school. A few weeks later a crew was on-site ready to perform the work