wiscoconcretesolutions.com
Home
Case Studies and Repairs
  • Box Dam Water Intrusion
  • Manhole Repair
  • Sunken Driveway Slab Lift
  • Grain Bin Raising
  • Failing Seawall in FL
  • Kentucky Riverport Piling
  • Sunken Gymnasium Repair
  • Highway 11 Stabilization
  • Dubois Machine Company
  • Two Rivers Seawall Repair
  • Firehouse Settlement
  • Whittier Dolphin Cell
  • Seawall/Bulkhead Repair
  • Silver Ranch Dam Repair
Our Premium Services
  • Concrete Lifting/Leveling
  • Void Filling
  • Soil Stabilization & DFI
  • Commercial & Municipal
  • Permeation Grouting
  • Seawall Repair
  • Driveway & Sidewalk
  • Garage & Basement Slab
  • Structural & Foundation
  • Manhole Repair & Sealing
  • DCP & Soil Testing
wiscoconcretesolutions.com
Home
Case Studies and Repairs
  • Box Dam Water Intrusion
  • Manhole Repair
  • Sunken Driveway Slab Lift
  • Grain Bin Raising
  • Failing Seawall in FL
  • Kentucky Riverport Piling
  • Sunken Gymnasium Repair
  • Highway 11 Stabilization
  • Dubois Machine Company
  • Two Rivers Seawall Repair
  • Firehouse Settlement
  • Whittier Dolphin Cell
  • Seawall/Bulkhead Repair
  • Silver Ranch Dam Repair
Our Premium Services
  • Concrete Lifting/Leveling
  • Void Filling
  • Soil Stabilization & DFI
  • Commercial & Municipal
  • Permeation Grouting
  • Seawall Repair
  • Driveway & Sidewalk
  • Garage & Basement Slab
  • Structural & Foundation
  • Manhole Repair & Sealing
  • DCP & Soil Testing
More
  • Home
  • Case Studies and Repairs
    • Box Dam Water Intrusion
    • Manhole Repair
    • Sunken Driveway Slab Lift
    • Grain Bin Raising
    • Failing Seawall in FL
    • Kentucky Riverport Piling
    • Sunken Gymnasium Repair
    • Highway 11 Stabilization
    • Dubois Machine Company
    • Two Rivers Seawall Repair
    • Firehouse Settlement
    • Whittier Dolphin Cell
    • Seawall/Bulkhead Repair
    • Silver Ranch Dam Repair
  • Our Premium Services
    • Concrete Lifting/Leveling
    • Void Filling
    • Soil Stabilization & DFI
    • Commercial & Municipal
    • Permeation Grouting
    • Seawall Repair
    • Driveway & Sidewalk
    • Garage & Basement Slab
    • Structural & Foundation
    • Manhole Repair & Sealing
    • DCP & Soil Testing
  • Home
  • Case Studies and Repairs
    • Box Dam Water Intrusion
    • Manhole Repair
    • Sunken Driveway Slab Lift
    • Grain Bin Raising
    • Failing Seawall in FL
    • Kentucky Riverport Piling
    • Sunken Gymnasium Repair
    • Highway 11 Stabilization
    • Dubois Machine Company
    • Two Rivers Seawall Repair
    • Firehouse Settlement
    • Whittier Dolphin Cell
    • Seawall/Bulkhead Repair
    • Silver Ranch Dam Repair
  • Our Premium Services
    • Concrete Lifting/Leveling
    • Void Filling
    • Soil Stabilization & DFI
    • Commercial & Municipal
    • Permeation Grouting
    • Seawall Repair
    • Driveway & Sidewalk
    • Garage & Basement Slab
    • Structural & Foundation
    • Manhole Repair & Sealing
    • DCP & Soil Testing

Firehouse Settlement Case Study

Problem

Problem

A firehouse in Las Vegas, Nevada had suffered from extreme settlement. This firehouse is essential to the community and was not able to shutdown. Piers were chosen to correct this settlement. The highest lift was 7 inches leaving a considerable void under the floor

 

Summary

Problem

A concrete lifting company was chosen to fill this void. They drilled 5/8th inch holes where the structure needed to be lifted in a 4 foot grid. The team planned to lift the building in stages, 2 inches at a time. After 2 inches of lift, they filled the void under the floor so it was supported during the lifting process. This continued until the structure was at the correct height. In addition to piering the exterior 7 inches, there were three grade beams that ran through the firehouse that needed to be lifted. Without shutting down the building to the firefighter crew, it was not possible to pier the grade beams like they could with the exterior walls. The solution to this was to use the A Deep Foam injection process. Drilling 5/8 inch holes throughout the grade beams and into the soil below. Multiple Deep Foamjection™ pipes were installed, starting at the lowest spot of the grade beam to inject material. The first grade beam was down 2 inches. Once lifted, the void was filled between the exterior wall and grade beam. Another support beam was below the sleeping corridors and restrooms for the firehouse. A plumber marked out where the pipes were so they knew where to safely drill the holes.

  

Solution

Solution

Polyurethane void filling was the best solution for the firehouse to stay in operation. The holes were drilled ahead of time to save time. The firefighters were able to continue using the sleeping corridors and restroom as this project was in progress. This project was completed in 10 days while keeping the firehouse fully operational. Three beams were lifted successfully and all voids were filled in this 8,400 square foot building. 15,000 pounds of material were used to complete this project. The two HMI polyurethanes used to complete the project were RR401 and HF402.

 

Learn more about Structural Slab & Foundation Support

Copyright © 2025 wiscoconcretesolutions.com - All Rights Reserved.

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept