A concrete lifting company was chosen to fill this void. They drilled 5/8th inch holes where the structure needed to be lifted in a 4 foot grid. The team planned to lift the building in stages, 2 inches at a time. After 2 inches of lift, they filled the void under the floor so it was supported during the lifting process. This continued until the structure was at the correct height. In addition to piering the exterior 7 inches, there were three grade beams that ran through the firehouse that needed to be lifted. Without shutting down the building to the firefighter crew, it was not possible to pier the grade beams like they could with the exterior walls. The solution to this was to use the A Deep Foam injection process. Drilling 5/8 inch holes throughout the grade beams and into the soil below. Multiple Deep Foamjection™ pipes were installed, starting at the lowest spot of the grade beam to inject material. The first grade beam was down 2 inches. Once lifted, the void was filled between the exterior wall and grade beam. Another support beam was below the sleeping corridors and restrooms for the firehouse. A plumber marked out where the pipes were so they knew where to safely drill the holes.